Double-Deck Exhibition Stand: When Does It Make Sense, What Should Be Considered?
July 26, 2026
A double-deck (two-storey) exhibition stand adds a load-bearing upper floor above the floor space you rent, almost doubling the usable area. Lima Fuar builds more than 150 stands a year; at least 30 of them are double-deck structures of 5 metres or more. This article answers the questions our clients ask most often on those projects: when it makes sense, what drives the cost, how long it takes and what the organiser will require.
The short answer: when does it make sense?
- Your stand space is 40–50 m² or more. On smaller plots the staircase and columns take up too much of the floor.
- You need to separate product display from private meetings on the same stand: ground floor for visitors, upper deck for meetings.
- The organiser allows a second level and the hall ceiling is high enough.
- You have at least 5–6 weeks after design approval.
A real example: a 144 m² two-storey stand in Stuttgart
The stand we built for Vapor Handel GmbH at UNITI expo 2026 sits on a 144 m² plot. The ground floor is given to product display and reception, the upper deck to enclosed and open meeting areas. Photographs are on the project page. On a single-storey stand with the same footprint, those meeting areas would either take space from the display or not exist at all.
What to ask the organiser in writing
- Can a double-deck stand be built at this show and in this hall?
- What is the maximum permitted construction height?
- Is there an additional charge for the upper-level area, and how is it calculated?
- By what date and in what format must the structural calculation and drawings be submitted?
- Is there a limit on the number of people or the load on the upper deck?
The answers differ from show to show. At German venues, double-deck stands need a separate structural approval and engineer-signed drawings, and most venues also charge for the upper-level area.
Who prepares the structural calculation and approval?
On double-deck projects we prepare and follow up the structural calculation, the electrical plan and the approval applications to the organiser. What we need from you is the organiser’s technical regulations, the plan of the rented plot and what the upper deck will be used for. Because the approval process is added to the production schedule, we plan 5–6 weeks from design approval to handover for double-deck stands and projects above 100 m²; for single-storey custom stands it is 3–4 weeks.
What drives the cost?
A double-deck stand costs more than a single-storey stand on the same footprint. Four items make the difference: the load-bearing structure with staircase and railings, structural calculation and engineering, the organiser’s charge for the upper level, and a longer build-up with a larger crew. For current price ranges of single-storey stands, see our price guide; for double-deck projects we quote per project, because area, height and the venue’s rules together determine the price.
Alternatives to a second level
If the plot is under 40 m² or the organiser does not allow it, there are other ways to use height: a tall brand tower, suspended ceilings and rigging, or a raised platform on part of the stand. These shorten the approval process and lower the budget, but they do not add usable floor area.
Related pages: our custom wooden stand service, stands for German trade fairs, request a quotation.
Frequently Asked Questions
What is the minimum size for a double-deck exhibition stand?+
In practice 40–50 m² or more. On smaller plots the staircase and structure take up too much usable floor.
How long does a double-deck stand take?+
5–6 weeks from design approval to handover. For single-storey custom stands it is 3–4 weeks; the difference is the structural approval.
Who prepares the structural calculation and approvals?+
We prepare and follow up the structural calculation, the electrical plan and the approval applications to the organiser. We ask you for the organiser’s technical regulations and the plan of your plot.
Can a double-deck stand be built at every show?+
No. Ceiling height limits, structural approval requirements and organiser policy differ from show to show; written approval from the organiser is needed before deciding.
Ready for your next exhibition?
Let us design a similar stand for you — quote within 24 hours.
